Disaster Recovery Plan (DRP)

Last Updated:
February 17, 2025

A Disaster Recovery Plan (DRP) is a comprehensive strategy designed to restore Operational Technology (OT) operations quickly and effectively after a cyberattack, natural disaster, equipment failure, or other catastrophic events. It ensures that critical systems and processes are operational in a timely manner to minimize downtime, financial loss, and safety risks.

Importance of a DRP in OT Environments

  1. Ensures Operational Continuity:
    • Restores essential services and minimizes production downtime.
    • Example: Resuming power grid operations after a ransomware attack on SCADA systems.
  2. Mitigates Financial Losses:
    • Reduces the cost of prolonged outages by enabling faster recovery.
    • Example: Restoring a manufacturing line quickly to avoid missed production quotas.
  3. Protects Safety:
    • Addresses risks to personnel and public safety caused by disrupted OT systems.
    • Example: Ensuring chemical plant safety systems remain operational after a system failure.
  4. Supports Compliance:
    • Demonstrates adherence to regulatory and industry standards for disaster preparedness.
    • Example: Meeting NERC-CIP requirements for recovery plans in critical infrastructure.
  5. Enhances Resilience:
    • Prepares the organization to respond effectively to a variety of disaster scenarios.
    • Example: Developing backup protocols for key OT devices to handle network outages.

Key Components of a Disaster Recovery Plan

  1. Risk Assessment:
    • Identifies potential threats and their impact on OT systems.
    • Example: Evaluating the risk of cyberattacks, equipment failures, or natural disasters.
  2. Business Impact Analysis (BIA):
    • Determines the operational and financial impact of downtime.
    • Example: Assessing how long critical processes like water treatment can remain offline.
  3. Recovery Objectives:
    • Defines Recovery Time Objective (RTO) and Recovery Point Objective (RPO).
    • Example: Setting an RTO of 4 hours for SCADA system restoration.
  4. Backup Strategy:
    • Establishes protocols for creating and maintaining data backups.
    • Example: Weekly full backups of PLC configurations stored offsite.
  5. Redundancy and Failover:
    • Incorporates redundant systems to ensure continuous operation during failures.
    • Example: Using secondary RTUs as backups for primary devices.
  6. Communication Plan:
    • Details on how to communicate with stakeholders during a disaster.
    • Example: Notifying plant operators and cybersecurity teams immediately after an incident.
  7. Roles and Responsibilities:
    • Assigns clear responsibilities for disaster recovery tasks.
    • Example: Designating the IT team to handle network restoration and the OT team to verify system functionality.
  8. Testing and Training:
    • Regularly tests the DRP to ensure effectiveness and trains personnel on their roles.
    • Example: Conducting quarterly disaster recovery drills for ransomware scenarios.
  9. Incident Documentation:
    • Outlines procedures for documenting incidents and recovery actions.
    • Example: Logging all steps taken to restore operations during a system failure.

Steps in Developing a DRP for OT

  1. Identify Critical Systems and Processes:
    • Determine which OT assets and processes are essential for operations.
    • Example: Prioritizing recovery for control systems managing power distribution.
  2. Conduct a Vulnerability Assessment:
    • Analyze potential weak points in the infrastructure.
    • Example: Identifying legacy PLCs vulnerable to cyberattacks.
  3. Develop Backup and Restoration Plans:
    • Establish methods to create, store, and restore backups.
    • Example: Configuring automated daily backups for SCADA databases.
  4. Implement Redundancy:
    • Deploy redundant systems to reduce the impact of outages.
    • Example: Installing redundant servers for HMI applications.
  5. Create a Communication Framework:
    • Ensure clear lines of communication among stakeholders.
    • Example: Pre-defining escalation protocols for notifying executives and response teams.
  6. Test the Plan Regularly:
    • Validate the DRP’s effectiveness through simulations and real-world scenarios.
    • Example: Simulating a DDoS attack to test the recovery process for networked OT devices.
  7. Update the Plan Continuously:
    • Revise the DRP as systems, processes, and threats evolve.
    • Example: Updating recovery strategies to address emerging ransomware variants.

Technologies Supporting DRP in OT

  1. Backup Solutions:
    • Example: Veeam Backup & Replication for maintaining device configurations and logs.
  2. Redundant Systems:
    • Example: High-availability SCADA servers to ensure continuous monitoring.
  3. Failover Mechanisms:
    • Example: Automatic failover for industrial routers in case of primary network failure.
  4. Disaster Recovery as a Service (DRaaS):
    • Example: Cloud-based solutions for storing and restoring critical OT data.
  5. Monitoring Tools:
    • Example: Nozomi Networks for detecting disruptions and initiating recovery processes.

Best Practices for DRP Implementation in OT

  1. Adopt a Holistic Approach:
    • Integrate IT and OT recovery plans to address overlapping systems.
    • Example: Coordinating recovery for both SCADA servers and corporate databases.
  2. Focus on Cybersecurity:
    • Incorporate measures to counteract cyberattacks in the DRP.
    • Example: Including ransomware decryption steps and network isolation protocols.
  3. Ensure Regular Backups:
    • Perform backups frequently and verify their integrity.
    • Example: Using checksums to validate the accuracy of RTU configuration backups.
  4. Segment Critical Systems:
    • Isolate critical OT assets to reduce the spread of disruptions.
    • Example: Placing power plant control systems on separate VLANs.
  5. Train Personnel:
    • Provide regular training on disaster recovery procedures.
    • Example: Conducting hands-on exercises to restore HMI operations.
  6. Collaborate with Vendors:
    • Work with OT device manufacturers to ensure timely updates and support.
    • Example: Partnering with a vendor to troubleshoot and restore failed PLCs.
  7. Document Lessons Learned:
    • Review incidents and update the DRP based on findings.
    • Example: Revising response timelines after a delayed SCADA restoration.

Compliance Standards Addressing DRP

  1. IEC 62443:
    • Recommends disaster recovery planning as part of security lifecycle management.
  2. NIST Cybersecurity Framework (CSF):
    • Highlights recovery planning under the Recover function.
  3. ISO/IEC 27031:
    • Provides guidelines for business continuity and disaster recovery planning.
  4. NERC-CIP:
    • Requires disaster recovery plans for critical cyber assets in the energy sector.
  5. FEMA Guidelines:
    • Offers a framework for disaster recovery in critical infrastructure.

Examples of DRP in Action

  1. Ransomware Attack on SCADA Systems:
    • A manufacturing plant activated its DRP, isolating the affected systems, restoring SCADA configurations from backups, and resuming operations within 6 hours.
  2. Natural Disaster Affecting Power Grid:
    • A utility company used redundant RTUs and remote monitoring tools to maintain control during a storm, restoring full operations as conditions normalized.
  3. Malware Infection in Chemical Plants:
    • Digital forensics revealed the entry point of malware; the DRP facilitated the restoration of infected devices and implemented enhanced access controls.

Conclusion

A Disaster Recovery Plan (DRP) is essential for ensuring the resilience and continuity of OT operations in the face of cyberattacks and catastrophic events. Organizations can minimize downtime, protect safety, and adhere to regulatory requirements by addressing risks, implementing redundancy, and testing recovery strategies. A well-executed DRP enables swift and effective recovery, safeguarding critical infrastructure and operations.

Dynamic Network Segmentation
Edge Computing
Emergency Shutdown System (ESD)
Encryption
Endpoint Detection and Response (EDR)
Endpoint Security
Error Detection
Error Handling
Escalation of Privileges
Event Correlation
Event Logging
Event Monitoring
Event-Based Response
Execution Control
Exfiltration Prevention
Exploit
External Attack Surface
Fail-Safe
Failover
False Positive
Fault Isolation
Fault Tolerance
Federated Identity Management
File Integrity Monitoring (FIM)
Firewall
Previous
Next
Go Back Home